Your are Here : Home> English > Contractors > Elite Projects

Tekeze Hydropower Station, Ethiopia

(By CGGC)

Updated: 2017-09-08 08:11:32

Share to:

Location:Tigrai, Ethiopia

Dam type:thin-walled concrete double-curve arch dam, with maximum dam height of 188m

Installed capacity:300MW (4×75MW)

Construction period:2002—2010

Contract type:EPC

Financier:the owner

Description:Tekeze Hydropower Station is the largest Hydropower Station in Ethiopia. CGGC(CHINA GEZHOUBA GROUP CO.,LTD) undertook the most difficult part with the highest technology content, that is, the double—curve thin—walled concrete dam.